KÜBLER main sponsor at the Parliamentary Evening - Robert Habeck as guest

The latter hosted a parliamentary evening on September 26.
Keynote speaker: Dr. Robert Habeck, main sponsor: KÜBLER GmbH Energie-sparende Hallenheizungen.
An exciting speech, a great exchange platform and good discussions with the Federal Minister for Economic Affairs and Climate Protection: BMWK.
The event served as an excellent platform for the exchange of ideas and opinions between the various players in the field of energy efficiency. The participants had the opportunity to hold constructive discussions in an engaging setting and to think together about innovative solutions and strategies.
All in all, the Parliamentary Evening was a complete success, which not only impressed with the quality of the speeches and discussions, but also with the opportunity to deepen existing contacts and initiate new partnerships.
Interessiert an unseren Presse-Bildern?
Sie möchten alle Bilder aus dem Artikel in höchster Qualität herunterladen? Klicken Sie einfach unten auf den Button und genießen Sie unsere Pressebilder in höchster Auflösung!
Alle Pressebilder herunterladen-
Gas is decentralized, flexible, can be stored efficiently and is inexpensive. The energy source is a guarantee for the success of the energy transition. Ten associations from the gas industry have joined forces and formulated an appeal for the climate protection plan, explaining why gas as an energy source can already achieve significant CO₂ savings cost-effectively today.
-
The "Die Alu" site looks back on over a century of aluminum history. Today, 3A Composites and two other companies produce on the site in the south of Baden-Württemberg. A new lightweight hall with an area of 2,000 m² was built in 2023 to store the primary material. Shortly afterwards, the 20 x 55 m packaging hall was also modernized in terms of energy efficiency. The heating requirements After the exit from [...]
-
The old hall heating system consumes too much energy. And it is becoming increasingly unreliable. Good reasons to finally tackle heating modernization and replace the old system with a modern, energy-efficient one. But the expense seems high and is often shied away from. Yet today there are alternative solutions that can also be very interesting from an economic point of view.
-
The task The well-insulated new hall with an area of around 900 m² and a ceiling height of around nine meters will house storage areas for raw materials, machine parts and end products in addition to production. Christoph Buxbaum answers the question of what requirements he has for the heating of the new hall as follows: "Three simple reasons were decisive. The new building [...]





